A Woodbury-initialized, Riemannian L-BFGS-polished constant-envelope MU-MIMO-OFDM precoder reaches out-of-band power below 1.5e-12 with exact constant modulus and Bussgang NMSE below 2e-3 on two held-out overloaded (Λ ≈ 0.535, 24 antennas, 7 users) guard-band-null draws, against about 0.08 NMSE for Wiener plus CE projection
Level 0 of 5 · Tool
Correct and reusable, not a contribution on its own.
- Why this level
- This is a two-draw held-out win at one overloaded configuration. The controls are weak or degenerate (C2 collapses to one-step ZF plus CE), a capable affine-AP comparator came within about 2x of the OOB gate on dev and was not run on confirmation, there is no ablation, and the phase-transition theory was refuted. It is correct, reusable engineering from standard CE-precoding optimization rather than a contribution.
- Limits
- Two confirmation draws at one (M, K, Λ, ρ) point.
- The controls are weak or degenerate, and the capable comparators were not run on confirmation (affine AP, and Stage-2-only L-BFGS from a Wiener start).
- No ablation separates nullspace preservation from direct metric optimization, continuation and best-iterate selection, so mechanism attribution is unsupported.
- The study's proposed Λ = 1/2 feasibility phase transition was refuted by referees: constant-row and single-tone CE waveforms give OOB = 0 for every L < N.
- Hyperparameters and regime thresholds were tuned on development data.
- There is no comparison with published spectrally shaped CE or PAPR-constrained precoders.
- Proximal and Riemannian optimization of CE precoders is standard.
- Verification
- Rigorously checked, not machine-checkedinternal; not externally peer-reviewed
Summary
Setting:
- Constant-envelope (per-sample |x| = 1/√M) downlink MU-MIMO-OFDM precoding with M = 24 antennas and K = 7 QPSK users.
- Correlated Rayleigh channels (ρ = 0.45) and a hard contiguous guard-band stopband at load Λ = L/N + (K/M)(1 - L/N) ≈ 0.535.
- Confirmation draws use N_fft = 96.
Method: a per-tone Woodbury proximal ADMM initialization that preserves the ker(H_k) component. This is followed by Tikhonov-regularized Riemannian L-BFGS on the CE torus, minimizing a weighted OOB plus optimal-scale NMSE objective.
Results on 2 sealed single-use confirmation draws:
- OOB ratio 1.45e-12 and 1.27e-12.
- Maximum modulus deviation 5.6e-17.
- Bussgang NMSE 1.49e-3 and 1.92e-3.
- Bit-exact over two passes, 0.47 CPU-s.
Frozen controls on the same draws:
- Wiener plus CE projection (Jacobsson et al.): NMSE about 0.078-0.082.
- 'Rowspace GS' control: OOB about 0.0715. Its loop discards the iterate, so it reduces to one-step ZF plus CE projection.
Retrospective comparison (development draws only): 200-iteration affine alternating projection reached OOB 5.5e-4 to 5.7e-4 with NMSE 1.28e-3 to 1.29e-3. That narrowly fails the 3e-4 OOB gate while meeting the NMSE gate, so a budget-matched AP may well pass.
Notes are written for active Results at level 2 or higher. This page shows the record as the assessor wrote it.
Findings
Spatio-temporal constant-envelope MU-MIMO-OFDM precoding under hard guard-band nulls at stopband fraction Lambda = 0.5352 (f2_sub3). On 2 sealed unseen confirmation draws at N_fft = 96, a Woodbury-initialized, Tikhonov/Riemannian L-BFGS-polished precoder achieved out-of-band power ratio <= 1.45e-12 with exact constant modulus (max deviation 5.6e-17) and Bussgang NMSE <= 1.92e-3, bit-exact across two passes. The frozen controls gave NMSE ~0.078-0.082 (Wiener + CE projection) and OOB ~0.0715 (the C2 'rowspace GS' control, which collapses to 1-step ZF + CE projection). In a retrospective comparison on dev draws only, a correctly implemented 200-iteration affine alternating projection failed the OOB gate at this Lambda (5.67e-4 > 3e-4, NMSE 1.29e-3).
Provenance
Evidence files as they stood at assessment commit 23f054b.
Finding 1 f1
- investigations/st4-cold-exec-breaker/family2_ce_ofdm/verification/confirm_summary_f2_sub3_st4.jsonUnseen confirmation scores (oob_ratio, bussgang_nmse, c1_nmse, c2_oob, ce_valid) and bit-exact hashes
- investigations/st4-cold-exec-breaker/family2_ce_ofdm/verification/retrospective_affine_ap_control.jsonRetrospective dev-only comparison against true 50/200-iteration affine alternating projection
- investigations/st4-cold-exec-breaker/family2_ce_ofdm/shared/controls_f2.pyFrozen controls, including the degenerate C2 loop at line 178
Assessment history
| Date | Level | Commit | Rationale |
|---|---|---|---|
| 2026-11-26 | 0 · Tool | 23f054b | This is a two-draw held-out win at one overloaded configuration. The controls are weak or degenerate (C2 collapses to one-step ZF plus CE), a capable affine-AP comparator came within about 2x of the OOB gate on dev and was not run on confirmation, there is no ablation, and the phase-transition theory was refuted. It is correct, reusable engineering from standard CE-precoding optimization rather than a contribution. claude-opus-5-5 |